AI-Enabled Estimating — every Bidding Enterprise team works with Build Intel and Dexter, our AI co-estimator. AI-Enabled Estimating · Built on Build Intel + Dexter See how →

Case study How a Brisbane tiling contractor won a 74-storey high-rise tender

Company name removed and logo blurred to protect our client’s privacy.

“We've just been successful in picking up a 74 story high rise in the Brisbane City.”

At a glance
  • ClientTiling, waterproofing and stone benchtop contractor (owner)
  • WhereBrisbane, Australia
  • Win74-storey high-rise, the largest job in Brisbane at the time, running into 2029
  • ScopeTakeoffs and revisions through the tender stage

The challenge

Large tenders change constantly, with many revisions during the tender stage and a lot of pricing to turn around.

What Bidding Enterprise did

The owner sends plans to his dedicated Bidding Enterprise estimator, Salman, who returns the takeoffs and handles the revisions throughout the tender stage.

The results

  • Won a 74-storey high-rise in Brisbane city that runs into 2029
  • Keeps up with heavy pricing during tender revisions
  • In the owner's words, "It just makes my job so much easier"
Read the full video transcript

I'm the owner of a company. We do supply and install, tile, tiling, waterproofing and stone benchtops. I'd like to give a big shout out to Salman for all the hard work that he does for us. He's my main guy when it comes to measuring all these jobs. You know, for instance, we've just been successful in picking up a 74 story high rise in the Brisbane City, which is the largest job going in Brisbane at the moment and that job will run into 2029. So something like that changes a lot along the way during the tender stage. A lot of revisions. I lean on him a lot during that stage. We pump out a lot of pricing. You know, I send the plans to him. He sends me back the take off. It just makes my job so much easier. Thanks a lot, Salman. And thanks to the Bidding Enterprise team for all the support they've given us.